<legend id="h4sia"></legend><samp id="h4sia"></samp>
<sup id="h4sia"></sup>
<mark id="h4sia"><del id="h4sia"></del></mark>

<p id="h4sia"><td id="h4sia"></td></p><track id="h4sia"></track>

<delect id="h4sia"></delect>
  • <input id="h4sia"><address id="h4sia"></address>

    <menuitem id="h4sia"></menuitem>

    1. <blockquote id="h4sia"><rt id="h4sia"></rt></blockquote>
      <wbr id="h4sia">
    2. <meter id="h4sia"></meter>

      <th id="h4sia"><center id="h4sia"><delect id="h4sia"></delect></center></th>
    3. <dl id="h4sia"></dl>
    4. <rp id="h4sia"><option id="h4sia"></option></rp>

        Page tree

        Versions Compared

        Key

        • This line was added.
        • This line was removed.
        • Formatting was changed.

        ...

        By default, the maximum work for a project is constrained globally, and specific projects are constrained by project settings.

        Image RemovedImage Added

        In this page, we can set the global default parameters and also allow to set the limit settings for each JIRA project.

        if select (B) sum all project enable, The summ of working hours in all projects of JIRA site need to satisfy the setting

        After setting, we will give a prompt if the working hours are not within the set range

        ...